KTA – Revision mark. This document has been modified by: KTA Ber Loading recommended items Back to top. About us. KTA () Inspection, Testing and Operation of Lifting Text; Inspection, · Requirements, · Materials, · Lifting, · Component, · Examination, · Specimen. Philosophy of KTA and KTA Norbert Schilling, NKMNOELL. – Fennovoima, Finland 6 – Hanhikivi 1. Vesa-Pekka Arola, Fennovoima.

Author: Vudodal Kegul
Country: Tanzania
Language: English (Spanish)
Genre: Art
Published (Last): 19 May 2010
Pages: 46
PDF File Size: 15.44 Mb
ePub File Size: 3.65 Mb
ISBN: 375-7-97146-284-9
Downloads: 1507
Price: Free* [*Free Regsitration Required]
Uploader: Akigrel

The designs and quality standards of our wire rope- More information.

Taking into account the meaning kha usage of auxiliary verbs in the German language, in this translation the following agreements are effective: Accessibility, structure and marking 39903 Electric mains, electric main connection switch, crane disconnecting switch, crane switch e Control stands, operating equipment, wireless controls, control stands interlocks, emergency stop devices DIN ENSections 4.

Load testing and inspection of overhead cranes is required by many safety regulations, national consensus. Spring pressure single-disc brake 76 Properties Free of float metal bellow coupling with integrated torque measurement Non-contact measurement system, high robustness High torsional stiffness Limited torque of inertia Performance Measurement.

Non-destructive tests shall be performed in accordance with Annex B. They are straightforward to inspect. This manual does not cover the procedure for disenabling.

If a calculation is submitted which was performed by means of automatic data processing equipment, either a comparative calculation to verify the results or an examination of the program description as well as of the input and output data shall ktx performed. Work is to be performed in conjunction with the manufacturer s More information. In addition, special instructions for the lifting equipment to be operated shall be provided, and the operator s knowledge shall be kept up-to-date.

  FLUKE 190 062 PDF

Here, the extent of examination shall equally cover the welding work done by all welders. In addition, lifting equipment shall be installed and operated in accordance with the general Federal and State Safety Regulations and the regulations of the statutory accident insurance institutions.

The performance of radiography shall be spot-checked by the authorized ota. Mechanical Installation Page Welds with particular quality acc.

On newer versions of Microsoft Word More information. Installation guide for the SafeLine type anchorage device. System trolleys must More information. Parts lines Hoist Number of lines of rope supporting the load block or hook.

On newer versions of Microsoft Word. This specification covers the installation, testing and precommissioning of mechanical equipment. The documents required under ha and hb should be submitted in due time prior to establishing the documents required under hc so that an evaluation of the basic design features of the software e.

Safety Standards. of the Nuclear Safety Standards Commission (KTA) – PDF

High Strength Steel HSS tubes for structural and engineering applications 2 Kt produces a large dimensional range of seamless tubes in high strength steel for engineering and structural applications.

Application of Welding Standards in Hong Kong. Installation and operating instructions. Introduction The load cells in the model and series are primarily designed for the measurement of force More information. Indication of the number of disassembly and re-assembly 390 and on intended tests and examinations prior to re-using them e.

PED and EN-standards and nuclear safety requirements. Failure to follow these inspection procedures can cause More information.

Manufacture Ktz und More information. Each weld shall be subjected to a visual examination. In addition, the following supplementary examinations shall be performed: DINSections 9 and 10, however with 1. It can extend More information.

  ELEKTROMATERIAL KATALOG PDF

Explosion proof enclosures 1 of 7 Explosion proof enclosures DE8 C 2 of 7 The Ex d enclosures are rugged and designed for harsh environment like: They are defined in DIN Note: Crane standing on firm, horizontal ground.

Over the last years of model boiler making the only real change in construction methods has 390 the change over from rivets and caulking.

Safety Standards. of the Nuclear Safety Standards Commission (KTA)

Parts lines Number of lines of rope supporting the load block or. No times the operational load. Addendum 1 March Effective Date: Here, the following applies: Examples are given in the individual Sections of KTA 6 Authorized inspector The authorized inspector for the tests and inspections to be conducted in accordance with this safety standard is the authorized inspector called in by the licensing or supervisory authority in accordance with Section 20 of the Atomic Energy Act. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four 4 removable outriggers, More information.

A configuration and identification documentation KID is a documentation of the related hardware and software components and the system structure so that they are clearly identifiable Documents regarding hydraulic and pneumatic equipment a schematic diagrams, b functional sequence plan, c strength calculations, d parts lists specifying technical data Documents on ergonomic design The measures taken to meet the ergonomics requirements of KTASection 4.

The user accepts that. Presented by Paul Laidler.