Ge VAT Pdf User Manuals. View online or download Ge VAT Instruction Manual. View and Download GE VAT instruction manual online. AC SPEED CONTROL EQUIPMENT. VAT Controller pdf manual download. GE’s distributor or our sales representatives who will be willing to help you. Please keep GE’s inverters are all passed the function test before delivery. Please.

Author: Vudomi Zulkilrajas
Country: Barbados
Language: English (Spanish)
Genre: Relationship
Published (Last): 11 March 2013
Pages: 280
PDF File Size: 3.4 Mb
ePub File Size: 10.45 Mb
ISBN: 191-2-85071-831-8
Downloads: 63558
Price: Free* [*Free Regsitration Required]
Uploader: Kigahn

Changes to the Utility Mode.

Flow Of Test Operation 3. Sensor mode uses a encoder fited on motor shaft to feedback the real motor speed. To print the manual completely, please, download it.

Selection Of Operation Mode Maintenance and Inspection Troubleshooting with fault display The countermeasures for when the inverter stops with a fault code display are shown in Table Precautions For Safety Precautions For Safety Precautions For Safety Items to be observed to prevent physical damage and to ensure safe use of this product are noted on the product and in this instruction manual.

All these are selectable by the user. Light duty allows the drive to be used for one frame bigger motor.

Fanuc Part finder Product number: Chapter 3 Test Operation And Adjustment Available from 0,4 to kW. IO-n sub-code Gate Shutdown Circuit error.

GE VAT2000 Manuals

VAT automatic tuning can be carried out independently for each of the following types of control. Control Functions and Parameter Settings Ye Overspeed protection level This parameter set the overspeed protection level, as a percentage in respect to the maximum frequency B or maximum speed B Parameter B software option function Parameter Vatt2000 hardware option function Failure to observe this could lead to injuries.

  GRADEZNI MATERIJALI PDF

Measure the output voltage, and confirm that the three phases are balanced. Operation Panel Keypad The functions of each section are shown in Table Table Name Default Min.

GE VAT2000 Instruction Manual

Page Page Page – Adjusting the vector control speed contr Some of these include settings that must be made according to the power supply and motor constants before actually starting operation.

Display 5 digit display and 8 status Led’s. Troubleshooting With No Fault Display 3. Table of contents Table Of Contents Got it, continue to print. Remote Run command status Frequency speed vaf2000 input A: The operation of the VAT must be checked every six months by turning the power on.

When using the 2-phase pulse, the rotation direction is judged by the advance and delay of the 2-phase pulse. Control Functions and G Settings B Regenerative current limit The regenerative torque to deceleration running is limited. Chapter 1 Delivery Inspection And Storage Note 6 Power supply capacity Make sure that capacity of the transformer used as the inverter’s power supply is within the following range.

  EICO 1030 PDF

Sensor Vector Control Reference: C to 5 and C The torque limit can be set independently for both speed control ASR mode or torque control ACR mode independently for drive or regeneration status. Items shown as ‘in stock’ and confirmed as ordered by 3pm Mon-Thu and 12pm Fri excluding Bank Holidays can be delivered the next working day.

Check the power supply system and correct if necessary.

Delivery Inspection And Storage Maximum overload allowed in CT: Settings Of Vvat2000 Before Operation Electromagnetic Compliance, Emc 7. Preparation For Operation Automatic tuning measures the constants of the connected motor, and automatically adjusts the parameters so that the system is used to their maximum performance.

VAT GE Power Control AC Speed Control VATU2KX07K5s

Chapter 2 Installation And Wiring Code Gat2000 and remedy 1. It is possible to use any analog input either as setting or feedback.

Set desired frequencies or speed to parameters B to B, in percentage of maximum output B and B Speed selection p p Bynary: Chapter 4 Operation Panel Failure to do so could lead to electrical shocks or fires.

Programmable Sequence Output Function pso 5. Forward run Time This completes changing of the setting value.